Abbott Road Rehabilitation

Alaska Project No. Z539420000 Federal Project No. 0506003

Phase I


Project elements being considered for Phase I include the following:

  • Widening the roadway to accommodate a continuous two-way left-turn lane with designated left turns
  • Adding an additional eastbound lane for approximately 1,800 feet east of Lake Otis Parkway
  • Lengthening (or flattening) crest vertical curves
  • Rehabilitation of the existing pathway from Lake Otis Parkway to Trailside Elementary driveway Jupiter Drive
  • Upgrading the Little Campbell Creek culvert to accommodate fish passage
  • Installing an experimental feature; pre-cast concrete slabs & monitoring equipment to monitor rutting
  • Constructing off-street transit stops along Abbott Road
  • Replacing traffic signals and Lighting at Lake Otis Parkway and Elmore Road
  • Improving drainage, as needed
  • A right turn lane from eastbound Abbott Road onto Birch Road
  • Relocating utilities, as needed
  • Clearing vegetation to improve safety and sight distance

Phase I Fact Sheet

Phase I Figure

Project Schedule

Project Schedule

Phase I Contact:

Steve Jochens, P.E.
Construction Project Manager
Phone: (907) 269-0659
steven.jochens@alaska.gov


Karin McGillivray
Public Involvement Manager
Michael Baker International
Phone: (907) 273-1614
kmcgillivray@mbakerintl.com

 



Trouble opening documents? Download Adobe Reader Download Adobe Reader