Abbott Road Rehabilitation

Alaska Project No. Z539420000 Federal Project No. 0506003

Phase II


Project elements being considered for Phase II include the following:

  • Widening the roadway to accommodate a continuous two-way left-turn lane with designated left turns from Elmore Road to the eastern school entrance
  • Lengthening (or flattening) crest vertical curves
  • Widening shoulders to 6 feet
  • Rehabilitation of the existing pathway from Jupiter Drive to Trailside Elementary driveway
  • Updating intersection lighting
  • Adding a separated right-turn pocket for eastbound Abbott Road traffic turning south onto Birch Road
  • Relocating utilities, as needed, and Undergrounding utilities, most notably along the south side of Abbott from Elmore Road to Birch Road
  • Clearing vegetation to improve safety and sight distance
  • Updating school signage

Phase II Fact Sheet

Phase II Figure

Project Schedule

Project Schedule

Phase II Contact:

Karin McGillivray
Public Involvement Manager
Michael Baker International
Phone: (607) 273-1614
kmcgillivray@mbakerintl.com